Online Course 3 –
Service Crew Underground
An in-depth exploration of the role Service Crew plays in installing and maintaining vita infrastructure underground from ventilation, air & water, power and coms cabling.
Course 3
Service Crew Underground |
||
Module 1 | Extending the services in an underground mine-.Review of the procedures for installing services (air & water) within an underground mine. | 3.1.1 – Extending the services 3.1.2 – Poly Joiners 3.1.3 – Joining poly using the “Tap-in” method 3.1.4 – Joining poly using the “Screw-in” method 3.1.5 – Working smart in the basket |
Module 2 | Extending the power in an underground mine
– Review of the procedures for installation of power services for equipment within an underground mine. |
3.2.1 – Moving the power forward
3.2.1 – Removing the power
|
Module 3 | Extending the ventilation in an underground mine– Review of the procedures and types of ventilation for installation within an underground mine. | 3.3.1 – Ventilation used underground
3.3.2 – Knocker line
|
Module 4 | Extending Coms and Firing Line– Review of the procedures for installation of communications and firing infrastructure within an underground mine. | 3.4.1 – Extending the coms 3.4.2 – Extending the firing line 3.4.3 – Twitching the firing line |
Module 5 | Using the IT with Service Crew-.The importance the IT (Integrated Tool Carrier) plays in assisting service crew in installation and maintenance of services within and underground mine as well as its use during charge-up. | 3.5.1 – The IT and its different uses 3.5.2 – Using the IT when working with Service Crew 3.5.3 – Using the IT when working with Charge Up |
Module 6 | The Attachments used with the IT– A descriptive look at the different and varied attachments used with the IT and their uses. | 3.6.1 – Connecting the IT attachments
3.6.2 – The various IT attachments used
|
ONLINE Service Crew Underground
$120